Product Details:
|
Product Type: | PP Packing Strap Production Line | Raw Material: | 100% Cushed PP Straps Or Wash Flake |
---|---|---|---|
Assembly Structure: | Integral Type Extruder | Automation: | Automatic |
Driven Type: | Electric | Application: | Waste Paper, Steel Pipe, Steel Coil, Medical |
Processing Type: | Extruding Machine | Warranty: | 1 Year |
After-sales Service Provided: | Engineers Available To Service Machinery Overseas | Width: | 5-19 Mm |
Highlight: | Single-screw PP Strapping Band Machine,Production Line PP Strapping Band Machine,Servo Wrapping PP Strapping Band Machine |
Single-screw PP Strapping Band Machine PP Strapping Band Production Line Servo Wrapping Machine
PRODUCT DESCRIPTION OF PP STRAPPING BAND MACHINE
PP strapping band machine
PP strapping band machine is an efficient and highly automated extrusion production equipment. The PP straps produced are widely used in many industries and have stable product quality and broad market prospects.
The main components of PP strapping band machine
Feeder---- transfer PP raw materials into the machine.
Extruder----heat and melt the PP raw materials and extrude them into shape.
Molding mold---- make the molten PP tape embryo pass through the mold to form a strip.
Cooling water tank----cool the extruded PP tape embryo to ensure its shaping.
Tractor----pull out the cooled strapping tape to maintain a stable production speed.
Oven---- heat the strapping tape to improve its strength and toughness.
Embossing machine---- emboss the surface of the strapping tape to increase friction and prevent slipping.
Shaping oven----heat again, shape, and make the PP tape more standardized.
Reeler---- reel the strapping tape into rolls for easy storage and transportation.
.
EXTRUSION PARAMETERS TABLE
Model | PP-2 | PP-4 | PP-6 | PP-8 | PP-10 | PP-12 |
Raw material | PP polypropylene new material/recycled material | |||||
Number of tapes | 2 | 4 | 6 | 8 | 10 | 12 |
Width(mm) | 5-19 | 5-19 | 5-19 | 5-19 | 5-19 | 5-19 |
Thickness(mm) | 0.4-1.2 | 0.4-1.2 | 0.4-1.2 | 0.4-1.2 | 0.4-1.2 | 0.4-1.2 |
Line speed(m/min) | ≧260-300 | |||||
PLC control system | PLC | PLC | PLC | PLC | PLC | PLC |
Screw Model | 90 | 110 | 125 | 135 | 135 | 135 |
Reducer model | 200 | 220 | 250 | 280 | 280 | 280 |
Winding machine | Automatic winding machine /Semi-automatic winding machine | |||||
Screen Changer | Automatic/Manua | |||||
Production capacity 24H | 2.5-3T | 6-7T | 8-9T | 10-11T | 12-13T | 13--14T |
Cooling Time:
• The cooling time should be long enough to ensure the strapping has completely cooled to room temperature. Generally, the cooling time is 10-20 seconds for air cooling and 5-10 seconds for water cooling.
ADVANTAGE OF PP STRAPPING BAND MACHINE
1.Special design of the screw extrusion technology can be choosing as per customer needs.
2.Can process 100% recycled PP/PET bottle flakes or pellets.
3.Plasticization and stable extrusion can with PLC automatic control for the full line.
4.According different requirements, changing materials for make strap have better and special function. For example, the strap for packing cotton can be from enhancing the breaking strength and joint strength when welding strap.
5.Melt filter with two pistons with air venting design and back flushing.
6.Number of strap:1,2,4,6,Width: 5mm-22mm,Thickness: 0.5mm-1.5mm
7.Workers: 2 -3 workers per shift, 12 hours/shift.
FAQ
1. WHY CHOOSE US
We are the Professional manufacturer to develop the plastic extrusion machines in Shenzhen. Machine quality and customer satisfaction is our pursuit.Be sure we have the strength to provide you with quality machines and perfect service.
2. WHAT SERVICES DO WE OFFER?
Pre-sale communication → Design proposal, signature confirmation→Customized production→ Test machine before shipment →Package &
delivery→ Engineer installation→Training operator → Technical support
3. PAYMENT TERMS
30% of total amount should be paid by T/T as down payment ,the balance (70% of total amount) should be paid before delivery by T/T or irrevocable L/C by payment(at sight).
4. DELIVERY CONDITIONS
4.1 Delivery condition: FOB Shenzhen port or CIF destination Port.
4.2 Delivery terms: Within 30-60 working days after receipt of advanced payment, the seller should inform the buyer to do inspection,the seller should finish packing of goods and ready for shipment within 15 working days after the seller receipt the full payment.
5. WARRANTY TERMS
5.1 Warranty period: 12 months, starting from the machine receipt in customer's warehouse
5.2 Seller shall grant: services and spare parts, free-of-charge service throughout the entire equipment during warranty period.
5.3 long life service: the seller should provide long life service for the sold goods, the buyer pay for needed spare parts after the 12months warranty terms.
6. INSPECTION
When the machine finished, the seller should inform the buyer to do inspection before shipment, the seller guaranty good performance of all the sold goods.the seller undertake the material cost for the machine inspection in seller's factory. the buyer should come to seller's factory to do the inspection work, or the buyer could entrust any third party to come to seller's factory to do the inspection work.
FAQ
Q1:What about the payment terms?
A1:Always 30% down payment as deposit,70% balance pay before shipping.
Q2:What about the payment way?
A2:TT,L/C at sight or Google trade assurance.
Q3:If you will send engineer coming to our factory to install and test the machines?
A3:Yes,Every set of machine we will send professional engineer to your factory and help installation and test the machines for you.
Q4:If you have CE,SGS,ISO certificate?
A4:Yes,except these,if you also need other certificates,we also can help to apply.
Q5:If we buy your machines, can you offer us wear-out spare pats?
A5:Yes,We provide our high quality machine 1 years’ guarantee,and we will also offer you 1 years wear-out spare parts for free. Once your machines broken or doesn't work within 1 years and you can't solve it, firstly, we will try to help you to find problems from your words description by phone or other communication tools. Secondly, if the phone solutions still not work, our engineers will go to your factory to solve it. Meanwhile, they will teach you the related experiences for fixing.
Contact Person: Mrs. Lily
Tel: +8613922883873
Fax: 86-0755-88219285